Last updated:
You pressed “Place order” and then saw it: the bass player’s name for the band has two words, not three, or the drummer finally sent his size and it is not the one you guessed. This page tells you exactly how long you have to cancel or change a Strum Tee order, what can be changed, how to ask so it is done right the first time, and what happens to your money.
Cancelling or changing at a glance
- Window: within 24 hours of placing the order.
- How: email support@strumtee.shop with your order number and exactly what should change.
- What can change: typed text, size, colour, role, mug or poster size, shipping address, or the whole order cancelled.
- Cancelled orders: your payment is returned to your original payment method.
- After 24 hours: once it arrives, any piece can be returned within 60 days of delivery with a free label, and refunded within 7 days of receiving the return.
- Replies: within 24 hours on business days.
1. Why the window is 24 hours
Every Strum Tee piece is made to order, and making takes 1–3 business days from the moment you order. A tee with your band name on it is printed for you and nobody else, so once printing starts there is no unprinted version to swap in. The 24-hour window is the stretch in which your order can still be stopped or edited before it is made.
That is also why no proof is emailed. Your order goes ahead exactly as typed, with nothing held back waiting for an approval. The upside is speed; the trade-off is that the 24 hours are your safety net, so use them.
2. What you can change within 24 hours
Inside the window, almost anything about the order can be changed. The most common requests:
- The band name. Fix a typo (“Maple Stret Static” to “Maple Street Static”), a capital letter, a missing apostrophe or a different name altogether. Band names can be up to 20 characters on apparel and mugs and up to 22 on posters.
- The line under the name. Swap between Live in the Garage, Weekend Band, Cover Band, Open Mic Night, First Gig and No second line.
- The year. Add one, remove one or correct the four digits.
- Your spot in the band. Change Lead Guitar to Rhythm Guitar, or Bass to Vocals, on the Player Tee, the Player Hoodie or the Black Mug.
- The Gig Poster’s date line and place line. For example, from “Friday · Doors at 7” to “Saturday · Doors at 8”.
- The Stage Plot Poster’s members. Add, remove or respell a first name, up to six names.
- Size and colour. Any size from S to 5XL on tees, long sleeves, hoodies and sweatshirts, and any colour offered on the product page.
- Mug or poster size. 11 oz or 15 oz for the Band Name Mug, the Black Mug and the Count-Off Mug; 12×16 in or 18×24 in for the Gig Poster.
- The shipping address, as long as it is in the United States, Canada, Australia or New Zealand.
- The whole order, cancelled outright.
If a change affects the price, for example moving a tee from L to 3XL (which carries a $2 upcharge) or from 4XL down to XL (which removes a $4 upcharge), we tell you the difference in our reply before anything is done.
3. How to ask so it is done right
- Email support@strumtee.shop from the address you used at checkout, or use Submit a Ticket for a pre-filled email.
- Subject line: “Cancel” or “Change”, then your order number.
- Say which piece. If the order has several items, name the one to change: “the Gig Poster Tee in black, size L”.
- Write new text out in full, exactly as it should print. Do not write “fix the spelling”; write the whole corrected line. We print exactly what is typed, so we copy exactly what you send.
- Send it within 24 hours of placing the order. What counts is when your email reaches us.
- Wait for our confirmation. We reply within 24 hours on business days. Your change or cancellation is settled when you have our reply confirming it.
| You want to | Put this in your email |
|---|---|
| Fix a typo in the band name | The full corrected name, with capitals and punctuation exactly as they should print |
| Change a size | The piece, the size ordered and the size you want |
| Change the role on the back | The piece and the new role from the list: Lead Guitar, Rhythm Guitar, Bass, Drums, Keys or Vocals |
| Change the poster’s date or place line | Both lines in full as they should print |
| Update the Stage Plot members | The complete list of first names, one per line, up to six |
| Change the address | The complete new address, including unit number and ZIP or postal code |
| Cancel the order | “Please cancel the whole order” and the order number |
4. Requests that made it in time
4.1 One missing letter
The singer of Maple Street Static orders a Band Name Gig Poster Tee at 9 p.m. and notices an hour later that the cart summary read “Maple Stret Static”. She emails “Change” with her order number and writes the full corrected name: “Maple Street Static”. Her tee is printed with the right spelling, and nothing else about the order changes.
4.2 The gig moved
A guitarist orders an 18×24 in Gig Poster reading “Friday · Doors at 7” and “The garage on Elm Street”, then the band moves the show to Saturday. The same evening he sends both lines in full: “Saturday · Doors at 8” and “The garage on Elm Street”. Because he wrote out both lines, even the one that did not change, there is no doubt about what should print.
4.3 Two gifts for one guitarist
A father orders a Count-Off Mug for his daughter’s birthday, then learns her partner bought her the same mug that afternoon. He emails “Cancel” inside the 24 hours. The order is cancelled and his payment is returned to the card he paid with. He orders the Encore Embroidered Trucker Hat instead.
4.4 A new address in Auckland
A bass player orders her Player Hoodie to her old flat, then remembers she moves to a new place in Auckland, New Zealand, next week. She emails the complete new address, unit number and postal code included, within the window. The hoodie ships to the new address on the normal timing: 1–3 business days to make, then 7–14 business days in transit.
4.5 How the 24 hours are counted
The window runs for 24 hours from the time the order was placed, which is shown on your order confirmation email. It is a plain 24 hours, so an order placed at 9 p.m. on a Saturday has until 9 p.m. on Sunday. Our replies follow business days, so you may hear back after the weekend; what matters for the window is that your email reached us in time.
5. Refunds for a cancelled order
When we confirm a cancellation inside the 24 hours, the payment is returned to the original payment method you used for the order. Nothing has been made or shipped, so there is nothing to send back and no return label involved. How quickly the money then shows on your statement is up to your bank or payment provider.
If you cancel one piece from a larger order, the payment for that piece is returned in the same way and the rest of the order carries on.
A refund for a piece you return after delivery works differently: it is issued within 7 days of receiving your return. Both routes are explained on our Refund Policy.
6. After the 24 hours have passed
Once 24 hours have gone by, the order is in production and we cannot promise to cancel or change it. If something is urgent, such as a wrong address, email us anyway and we will tell you honestly what is still possible for that order.
If the order cannot be changed, you are still covered once it arrives. Every product, band-name pieces included, can be returned within 60 days of delivery. The return label is free, even for a change of mind, and the refund is issued within 7 days of receiving the return. You can then reorder with the right text or size. The steps are on our Returns & Exchanges Policy.
7. Typos: three ways to catch one
A typo in a band name is the most common reason people write to us after ordering. You get three chances to catch it, and each one is cheaper than the next:
- The poster check. As you type on the product page, the name appears in the print lettering under the fields. Read it slowly.
- The cart. Before checkout, the cart lists every typed line again. Read it as if you were the singer announcing the band.
- The 24-hour email. If the typo slipped through both, email us inside 24 hours with the corrected text in full.
Miss all three and the piece is printed as typed. It can still come back within 60 days with a free label.
8. When we email you about a band name
We do not print the names of existing artists or bands, brands, songs or lyrics. Band names can also be trademarks, which is why every band-name order has a required tick box confirming you have the right to use the name. If an order carries a name we cannot print, for example a garage band that happens to share its name with a famous act, we will email you to choose another. Reply with the new name in full, or tell us in your reply if you would rather cancel. Our Intellectual Property Policy explains more about names we cannot print.
9. Band orders: one member, one order
Each band member orders their own piece, so each member manages their own order. If the rhythm guitarist wants to switch his Player Tee from M to L, he emails us about his order; the other members’ orders are not touched.
This also means you do not need to cancel anything to add a member. When a new keys player joins after everyone else has ordered, she opens the same product, types the same band name exactly as the others did (check capitals and spacing against one of their confirmation emails), picks her size and role, and orders. There is no minimum and shipping is free, so a single extra piece costs nothing more to send.
If one person ordered several members’ pieces in one order and needs to change one of them, list the piece by size and role so we change the right one: “the 2XL Player Tee with Drums on the back, change to XL”.
10. Changes that do not need us at all
- Adding a piece: place a new order. Free shipping applies to every order, with no minimum.
- Ordering the same design for another person: new order, same steps.
- Adding a hat to a band-name order: the embroidered hats carry fixed designs, so just order the hat separately.
- A second colour of the same tee: order it as a new piece; the first order stays exactly as it is.
- Swapping text for a logo: not possible on any order, before or after the 24 hours. Band-name pieces are text only and there is no artwork upload. If you were hoping for your band’s logo, you can cancel inside the window, or return the piece within 60 days of delivery.
- A gift for someone whose band name you do not know: choose from the set-design range, which takes no text at all, so there is nothing that could need changing later.
11. Contact us
Email support@strumtee.shop with “Cancel” or “Change” and your order number in the subject line. We reply within 24 hours on business days. For delivery times, see Shipping & Delivery; for order statuses, see Order Tracking.
Strum Tee, 3111 Verdun Dr NW, Atlanta, GA 30305, US. Support is by email only.